Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
ACITIVE TRAVEL IMPROVEMENTS AT GELLIGALED PARK, YSTRAD RHONDDA – Calibre Contracting
Calibre Contracting

ACITIVE TRAVEL IMPROVEMENTS AT GELLIGALED PARK, YSTRAD RHONDDA

CardiffBusBay

Project Overview

The project consists of improvements to the Active Travel Route through Gelligaled Park in Ystrad Rhondda.

The works were to include the following:-
· Re-profiling of existing road running through Gelligaled Park;
· Installation of new kerbs;
· Provision of highway drainage;
· Provision of new open ditch channel;

Scope of Works:

The works will include the following:-
• Site clearance including the removal of site debris;
• Installation of drainage including pipes, manholes gullies, drainage channels etc;
• Excavation of existing verges, pavements and embankment construction;
• Carriageway resurfacing and reconstruction
• Installation kerbs
• Road markings and signing
• Street Furniture

Here is a selection of pictures from this project.

The project consists of improvements to the Active Travel Route through Gelligaled Park in Ystrad Rhondda.