Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Bridgend Active Travel Route – Calibre Contracting
Calibre Contracting

Bridgend Active Travel Route

Project Overview:

The scheme provides active travel facilities for pedestrians and cyclists along the A48, to expand on the existing active travel network. Footways along the A48 were widened into shared use facilities with footway and verge reconstruction. Existing puffin crossings were upgraded to toucan crossings.

Scope of Works:

The scope of works is as follows:

Vegetation Clearance.

Footway and Verge reconstruction

Traffic Sign and Street Lighting Improvements 

Signal Crossing Improvements