Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Bronallt Terrace Culvert Replacement – Calibre Contracting
Calibre Contracting

Bronallt Terrace Culvert Replacement

PROJECT OVERVIEW: 

The purpose of this project was to remove and re-instate the masonry section of the culvert as it was in poor condition and at risk of future flooding. 

SCOPE OF WORKS:

Our scope of services comprised of –

The removal and reinstatement of the masonry section of culvert, including the inlet head wall and the two manhole chambers. The masonry arch barrel was replaced with a HDPE pipe that tied into new manholes and inlet head wall. A bund was wrapped around the head wall, tying into the watercourse upstream to retain the watercourse during a flood event. The existing watercourse was tied into the new head wall using gabion baskets.