Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Cilfynydd Bus Stops – Calibre Contracting
Calibre Contracting

Cilfynydd Bus Stops

PROJECT OVERVIEW: 

The purpose of this project was the construction and upgrading of 30 no bus stop at various locations Cilfynydd, RCT.

SCOPE OF WORKS:

Our scope of services comprised of –

  • Removal of existing and installation of new bus shelters
  • Installation of raised ‘bus boarder’ access kerbs
  • Resurfacing of the footway construction to reflect the revised layout
  • Installation of the bus stop pole and signage and renewal of all bus stop lining works