Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Creigeau Active Travel Improvements – Calibre Contracting
Calibre Contracting

Creigeau Active Travel Improvements

Project Overview:

The purpose of this scheme was to bring highway improvements to Creigiau through the removal of three existing priority narrowing’s, replacing with tree tabled crossing facilities with realignment of junctions.

Scope of Works:

The scope of works is as follows:

Removal of existing priority narrowing’s

Construction of tabled zebra crossing facilities

Carriageway resurfacing and construction

Footway resurfacing

Installation of drainage.

Installation of belisha beacons

Construction of planter

Lining works

Raising and lowering of covers