Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
MAES Y FFYNON LANE DRAINAGE IMPROVEMENTS – Calibre Contracting
Calibre Contracting

MAES Y FFYNON LANE DRAINAGE IMPROVEMENTS

CardiffBusBay

Project Brief:

The project consisted of culvert drainage improvements.

The works contained the following key elements -

-          Culvert Cleaning including the removal of debris;

-          Installation of a Culvert lining system to areas with defects

Scope of Works:

The scope of works is as follows

-       Lining/repair of Culvert system

-       Clearing and cleaning of Culvert System

-       Condition/CCTV survey undertaken

The project consisted of culvert drainage improvements.