Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Taff Trail – Re-Alignment – Calibre Contracting
Calibre Contracting

Taff Trail – Re-Alignment

PROJECT OVERVIEW: 

The purpose of this scheme was to install a new section of footpath, drainage and fencing works, to form a diversion to the Taff Trail. The works involved constructing a new 3.0m wide shared use cycleway / footway. The route is located east of the existing route and is sited on higher ground. The aim was to reduce the frequency of flooding on this section of the Taff Trail.

SCOPE OF WORKS:

  • Site clearance including removal of site debris
  • Installation of fencing and gates
  • Drainage
  • Excavating of earthworks
  • Footway construction