Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Ty Glas Avenue – Calibre Contracting
Calibre Contracting

Ty Glas Avenue

PROJECT OVERVIEW:

The works formed part of Cardiff Council’s Safe Routes in the Community initiative, with the aim to provide a safer environment for pedestrians in the Llanishen area of Cardiff. This was achieved by implementing measures to slow vehicle speeds, whilst improving the quality of routes, crossing facilities to provide better access. The scheme delivered a new raised zebra crossing with localised footway and carriageway reconstruction.

SCOPE OF WORKS:

  • Installation of Full depth Road Construction
  • Installation of Concrete kerbs and central island
  • Installation of tarmac raised table and belisha beacons
  • Resurfacing to adjacent footpaths
  • Installation of new signage