Calibre Contracting

Barry Dock Road

Project

Barry Docks Link Road incorporating Barry Comprehensive School Cycleway Links:

Client

Vale of Glamorgan

Client Representative

Robert Munkley

Project Description

Barry Dock Road (A4231) is a very busy link road in the Vale of Glamorgan and comprising of  the construction of traffic signal controlled staggered junction including traffic signal heads and re-alignment of Kerb lines and construction of splitter islands, new central reserve and associated earthworks, drainage, Duct laying, upgrading of Street lighting, road signs and road markings, The surfacing works involved hand laying and machine laying using stone mastic asphalt and the traffic management involved lane closers on the Link road for the duration of the project. The Cycleway link elements 2, 3, 4, 5 and 7 comprised of a 3m wide cycle path with a approximate length of 3.3 km linking up the network throughout the county, the project comprised of extensive earthworks along the route and phasing the works in conjunction with the traffic/ pedestrian management plan, involvement throughout these work were the installation of concrete path edgings and duct laying for the improvements at bus stops and junctions. The cycle route had limited access points along the route and required hauling the materials via dump trucks due to the limited access and egress points and we also considered the loading and possible impacts on the existing ground conditions/ movements.

NextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnail
img_0405
img_0572
img_0862
img_3492
img_5880
img_8389
img_9697
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
barry-comp-cycleway-link-002
barry-comp-cycleway-link-003
barry-comp-cycleway-link-004
barry-comp-cycleway-link-005

The works included

  • Footway widening/ upgrading and provision of new drainage gullies
  • New central reserve and Splitter Island
  • Upgrading of lighting columns
  • Replacement of existing crossing
  • Construction of new bus stop
  • Installation of speed control (speed humps and cushions)
  • Surfacing, road markings and signage
  • Traffic Management
  • Site clearance and earthworks
  • Retaining Wall Construction
  • Carriageway planning and resurfacing
  • Installation of new traffic signal heads

Project Duration

30 Weeks