Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
CWMBACH – PHASE 2 – Calibre Contracting
Calibre Contracting

CWMBACH – PHASE 2

CardiffBusBay

Project Overview

The purpose of this scheme was to install a new headwall to existing culvert and introduce sustainable underground drainage systems on Sion Terrace, Cwmbach as a result of previous flooding.

Scope of Works

Our scope of services comprised of :

·         Installation of a new PCC headwall and grill

·         Installation of a new culvert and connection to existing headwall

·         Vegetation removal

·         Installation of two blockstone walls

·         Construction of concrete basin between blockstone walls

The purpose of this scheme was to install a new headwall to existing culvert and introduce sustainable underground drainage systems on Sion Terrace, Cwmbach as a result of previous flooding.