CWMBACH – PHASE 2

CardiffBusBay

Project Overview

The purpose of this scheme was to install a new headwall to existing culvert and introduce sustainable underground drainage systems on Sion Terrace, Cwmbach as a result of previous flooding.

Scope of Works

Our scope of services comprised of :

·         Installation of a new PCC headwall and grill

·         Installation of a new culvert and connection to existing headwall

·         Vegetation removal

·         Installation of two blockstone walls

·         Construction of concrete basin between blockstone walls

The purpose of this scheme was to install a new headwall to existing culvert and introduce sustainable underground drainage systems on Sion Terrace, Cwmbach as a result of previous flooding.