PROJECT OVERVIEW:
The purpose of this project was the construction of five raised tables with three on Greenway Road and two on Heol Hir. The project consisted of excavate and reinstate paved and flexible footway, new kerb lines, gullies and connections, tactiles, street lighting, road markings, construction of speed tables, resurfacing of carriageway, works to WPD network, Traffic Management, Liaising with statutory authorities, Implementing environmental strategies, Day to day dealings with the general public, Carriage and Logistics strategies for delivering materials
SCOPE OF WORKS:
Our scope of services comprised of –
To improve the traffic flow of these locations while decreasing traffic speeds and increase pedestrian safety through the use of raised zebra crossings, in addition the installation of gullies and resurfacing of approaches to the tables.
The purpose of this project was to construct 23 Bus Boarders within Cardiff City Centre on Cathedral Road and Dumballs Road. These are the main thoroughfare for traffic accessing the nearby city centre.