Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
PRIORITY NARROWINGS – Calibre Contracting
Calibre Contracting

PRIORITY NARROWINGS

CardiffBusBay

PROJECT OVERVIEW: 

The purpose of this project was the construction of five raised tables with three on Greenway Road and two on Heol Hir. The project consisted of excavate and reinstate paved and flexible footway, new kerb lines, gullies and connections, tactiles, street lighting, road markings, construction of speed tables, resurfacing of carriageway, works to WPD network, Traffic Management, Liaising with statutory authorities, Implementing environmental strategies, Day to day dealings with the general public, Carriage and Logistics strategies for delivering materials

SCOPE OF WORKS:

Our scope of services comprised of –

To improve the traffic flow of these locations while decreasing traffic speeds and increase pedestrian safety through the use of raised zebra crossings, in addition the installation of gullies and resurfacing of approaches to the tables.

The purpose of this project was to construct 23 Bus Boarders within Cardiff City Centre on Cathedral Road and Dumballs Road. These are the main thoroughfare for traffic accessing the nearby city centre.