Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Sirhowy Valley Country Park – Calibre Contracting
Calibre Contracting

Sirhowy Valley Country Park

SirhowiPI

  • The works involves land drainage remedial and the construction of a surface water culvert crossing  of cycleway network 1.8 metres wide to include insitu reinforced concrete culvert and cascade, with stone masonry cladding, reinforced concrete intake and outfall wing wall structures. The structure replaces the existing collapsed structure.
  • Tab 2 content goes here.
  • The works included

    • Reinstatement and construction of cycle track surfacing.
    • Associated excavation and earthworks.
    • Masonry pennant sandstone random rubble facing.
    • New timber post and four rail  fence
    • Lining of watercourses with seeded erosion control matting
    • Expansion joints and sealing
    • Cyclist diversion routes

    .

  • Invalid Displayed Gallery

The works involves land drainage remedial and the construction of a surface water culvert crossing  of cycleway network 1.8 metres wide to include insitu reinforced concrete culvert and cascade, with stone masonry cladding, reinforced concrete intake and outfall wing wall structures. The structure replaces the existing collapsed structure.