Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
A48 Heol Mostyn Junction Pyle – Calibre Contracting
Calibre Contracting

A48 Heol Mostyn Junction Pyle

Project Overview:

The purpose of this scheme was to change an existing priority give way junction to a signal-controlled junction with right turn lanes. The scheme changes was confined to existing highway boundary. Horizontally it was proposed to retain the existing kerb position. Vertical changes were made to the carriageway to improve cross falls.

Scope of Works:

The scope of works is as follows:

  • Removal of existing concrete carriageway
  • Drainage Improvements
  • Carriageway Construction and re-surfacing
  • New Traffic Signals
  • Associated traffic Signs and Road Markings