Project Overview:
The purpose of this scheme was to change an existing priority give way junction to a signal-controlled junction with right turn lanes. The scheme changes was confined to existing highway boundary. Horizontally it was proposed to retain the existing kerb position. Vertical changes were made to the carriageway to improve cross falls.
Scope of Works:
The scope of works is as follows:
- Removal of existing concrete carriageway
- Drainage Improvements
- Carriageway Construction and re-surfacing
- New Traffic Signals
- Associated traffic Signs and Road Markings