Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Cardiff Structures – Calibre Contracting
Calibre Contracting

Cardiff Structures

PROJECT OVERVIEW: 

The purpose of this project was to carry out routine and reactive works to Cardiff Council highway structures via task orders.

SCOPE OF WORKS:

Our scope of services comprised of the following –

  • Removal of Vegetation from Structures
  • Drainage Clearance from gullies, linear drainage systems 
  • Minor Concrete Repairs 
  • Repointing brickwork
  • Replacing Brickwork/Coping Stones
  • Timber decking panel replacement/repairs
  • Repairs/replacement  to fencing  Timber/metal
  • Excavation for Site Investigation 
  • Painting of Parapets for Subways/retaining walls
  • Replacement of movement joints sealant.
  • Providing barriers to make safe adjacent to structures
  • Masonry Works