Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interface domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alexbrya/calibrecontracting.co.uk/wp-includes/functions.php on line 6114
Mobility Access – Dropped Crossings – Calibre Contracting
Calibre Contracting

Mobility Access – Dropped Crossings

Project undertaken for Cardiff City Council to provide improved drop crossing facilities throughout the city centre and surrounding areas. The aim was to improve access to highway infrastructure for disabled and partially sighted users.

2012 / 2013 250 crossings completed
2013/ 2014 80 crossings completed